    ( 2003-07-03 15:01) (Chinadaily .com.cn)

    1. Spillway
    The Three Gorges Project is designed with a concrete gravity dam with a crest elevation of 185 meters and maximum height of 175 meters. The dam axis runs 2, 309. 47 meters long, which is even longer than the noted Grand Coulee Dam of US.

    The 483-meter spillway, located in the middle of the main dam, has 23 bottom outlets dimensioned at 7?á9 meters. Each of its 22 surface sluice gates measures 8 meters wide. The maximum discharge capacity of the TGP is 116,000 cubic meters, the biggest in the world.

    2. Left Powerhouse

    Two powerhouses, flanking the spillway, accommodate altogether 26 sets of turbine-generators. As the world's biggest unit ever made, each has a generating capacity of 700MW. The 643.6-meter-long left powerhouse, 60 meters longer than the 584.2-meter-long right one, houses 14 sets of generators. With all these huge generators, the TGP is designed to generate electricity of 84.7 TW/h.

    3.Right Powerhouse
    On the right bank, enough room has been preserved for the future underground powerhouse of 6 turbine generator units with 4, 200 MW of installed capacity. The intakes of these units will be constructed simultaneously with the project.


    4. Shiplift
    The TGP shiplift is the world's largest. With a one-step vertical hoisting mechanism, the shiplock, equipped with a 120?á18?á3.5-meter container, is capable of carrying a 3,000-ton passenger liner or cargo boat at a time.

    5.Temporary Shiplock
    A temporary shiplock was built during the TGP construction period with an effective chamber at 240?á24?á4 meters.

    6.Permanent Shiplock
    The Three Gorges Project (TGP) permanent shiplock is designed in a two-way, five-step pattern with each lock chamber measuring 280?á34?á5 meters (L?áW?áD) and capable of passing a 10,000-ton barge fleet.

    7.Dam Site
    After a long but prudent study on 15 alternatives, the dam site for Three Gorges Project was finally determined at Sandouping, where a number of favorable factors gather at the small town 30 kilometers west to the Yichang city.
    Sandoupin has a firm crystalline rock foundation, which is the most important geological condition a massive hydraulic project required of. The River valley here at Sandoupin is much broader than other site alternatives and hills on each sites lower.

    A small islet, called Zhongbaodao by locals and cleaving the Yangtze River at its center, offers the most favorable pattern for the river diversion needs scheduled in the first phase of the TGP.

    The bedrock of the dam site is sound and intact granite with 100 MPa of compressive strength. The faults and fissures in the bedrock are less developed and most of them are well cemented. The permeability of the rock mass and the weathered layers in the hills on both sides are also ideal.

    No potentially devastating geological structures was detected within 15 kilometers of its vicinity. The regional seismic activities are small and not frequent.

       
    Close  
      Go to Another Section  
         
     
     
         
      Article Tools  
         
      E-Mail This Article
    Print Friendly Format
     
         
       
            .contact us |.about us
      Copyright By chinadaily.com.cn. All rights reserved  
    亚洲色中文字幕无码AV| 色综合中文字幕| 中文字幕本一道先锋影音| 亚洲av福利无码无一区二区| 色综合中文字幕| 中文字幕人成高清视频| 无码人妻精品一区二区三区久久| а天堂中文在线官网| 国产亚洲精品无码专区| 无码精品视频一区二区三区| 狠狠精品久久久无码中文字幕| 中文字幕亚洲综合精品一区| 亚洲无码视频在线| 惠民福利中文字幕人妻无码乱精品 | 最新国产AV无码专区亚洲| 中文精品无码中文字幕无码专区| 毛片无码免费无码播放| 亚洲日韩国产二区无码| 中文无码精品一区二区三区| 精品久久久久中文字| 最近最好最新2019中文字幕免费| 中文字幕乱码中文乱码51精品| gogo少妇无码肉肉视频| 狠狠躁天天躁无码中文字幕| 色窝窝无码一区二区三区色欲| 在线a亚洲v天堂网2019无码| 无码毛片AAA在线| 欧美日韩毛片熟妇有码无码 | 狠狠躁天天躁无码中文字幕| 亚洲中久无码不卡永久在线观看 | 亚洲v国产v天堂a无码久久| 国产成人无码a区在线视频| 国产精品无码AV一区二区三区| 少妇伦子伦精品无码STYLES | 丰满人妻AV无码一区二区三区| 无码AV天堂一区二区三区| 少妇人妻无码精品视频app| 国产av无码专区亚洲av桃花庵| 免费一区二区无码视频在线播放| 亚洲精品无码久久久久AV麻豆| 熟妇人妻中文av无码|