    Investment

    POWERCHINA's investment covers hydropower, wind power, thermal power, solar power, waterworks, etc.more

    Hydropower

    Updated: 2013-06-27

    POWERCHINA has funded a number of power projects, such as the Heihetang, Shuanghe, Qinglong, Sichuan Leshan Shawan, Yadu, Liuping, Dajinping, Hongyi, and Maoergai hydropower stations, and Gansu Huating Thermal Power Plant, and holds shares of Yellow River Suzhi, Meiguhe Liuhong, Bailongjiang River Zilanba hydropower stations. The total installed capacity of POWERCHINA’s hydropower investment is 107,10 MW,among which 3570 MW is available for use, 1590 MW under construction; and 5550 MW at the preliminary study stage.

    Hydropower

    Hunan Taoyuan Hydropower Station, with a total installed capacity of 180 MW and an estimated total investment of 2.69 billion RMB, is under construction. The project gained governmental approval in August 2010. The first cofferdam was enclosed on Nov 17, 2012, and the second cofferdam on Oct 2, 2012. The first generator unit will be put into production in 2013.

    Hydropower

    The Heihetang Hydropower Station, on the lower reaches of the Heihe River, a primary tributary of the Baishuijiang River, in Sichuan province, has two units with a total installed capacity of 80 MW. The entire project is put on line in December 2006.

    Hydropower

    The Shuanghe Hydropower Station, on the upper reaches of the Baishuijian River, Sichuan Province, has three units and a total installed capacity of 81 MW. The entire project was put on line in June 2009.

    Hydropower

    The Qinglong Hydropower Station, on the main stream of the Baishui River, Sichuan Province, has three units and a total installed capacity of 102 MW. The entire project was put on line in July 2012.

    Hydropower

    The Nuozu Hydropower Station, on the middle reaches of the Nanpanjiang River’s main stream, has an installed capacity of 3 × 25 MW. The construction work began in December 2005; and the entire project was put on line in July 2009.

    Hydropower

    The Fenghuanggu Hydropower Station, on the lower reaches of the Nanpanjiang River, has a total installed capacity of 100 MW. The project was put on line in July 2009.

    中文字幕一区二区人妻性色| 西西午夜无码大胆啪啪国模| 中文字幕精品无码一区二区三区| 国产精品va在线观看无码| 久久久久久精品无码人妻| а√天堂中文官网8| 国产精品无码DVD在线观看| 亚洲AV无码成人精品区蜜桃| 波多野结衣中文字幕在线| 日韩A无码AV一区二区三区| 色综合AV综合无码综合网站| 久久久久亚洲AV无码专区首JN | 亚洲av无码一区二区三区在线播放| 中文午夜乱理片无码| 国产日韩AV免费无码一区二区三区| 亚洲AV无码精品无码麻豆| 无码国产精品一区二区免费式影视 | 日本中文字幕一区二区有码在线| 特级无码毛片免费视频尤物| 东京热av人妻无码专区| 无码av免费毛片一区二区| avtt亚洲一区中文字幕| 久久亚洲精品中文字幕三区| 伊人久久无码中文字幕| 无码专区久久综合久中文字幕| 久久精品无码一区二区三区日韩| 国产AV无码专区亚洲AV毛网站 | 久久久久无码精品国产| 少妇无码一区二区三区免费| 亚洲国产精品无码久久SM| 在线播放无码后入内射少妇| 国产成人精品无码一区二区三区| 欧美日韩国产中文精品字幕自在自线| 中文字幕在线一区二区在线| 中文字幕精品一区二区日本| 最近中文字幕mv免费高清视频8| 中文字幕在线观看亚洲| 在线欧美天码中文字幕| 中文字幕日韩精品无码内射| 亚洲日韩精品A∨片无码 | 特级小箩利无码毛片|