Home|Contact|Members|中文|
    Search
    Home > Domestic

    Investment

    POWERCHINA's investment covers hydropower, wind power, thermal power, solar power, waterworks, etc.more

    Hydropower

    Updated: 2013-06-27

    POWERCHINA has funded a number of power projects, such as the Heihetang, Shuanghe, Qinglong, Sichuan Leshan Shawan, Yadu, Liuping, Dajinping, Hongyi, and Maoergai hydropower stations, and Gansu Huating Thermal Power Plant, and holds shares of Yellow River Suzhi, Meiguhe Liuhong, Bailongjiang River Zilanba hydropower stations. The total installed capacity of POWERCHINA’s hydropower investment is 107,10 MW,among which 3570 MW is available for use, 1590 MW under construction; and 5550 MW at the preliminary study stage.

    Hydropower

    Hunan Taoyuan Hydropower Station, with a total installed capacity of 180 MW and an estimated total investment of 2.69 billion RMB, is under construction. The project gained governmental approval in August 2010. The first cofferdam was enclosed on Nov 17, 2012, and the second cofferdam on Oct 2, 2012. The first generator unit will be put into production in 2013.

    Hydropower

    The Heihetang Hydropower Station, on the lower reaches of the Heihe River, a primary tributary of the Baishuijiang River, in Sichuan province, has two units with a total installed capacity of 80 MW. The entire project is put on line in December 2006.

    Hydropower

    The Shuanghe Hydropower Station, on the upper reaches of the Baishuijian River, Sichuan Province, has three units and a total installed capacity of 81 MW. The entire project was put on line in June 2009.

    Hydropower

    The Qinglong Hydropower Station, on the main stream of the Baishui River, Sichuan Province, has three units and a total installed capacity of 102 MW. The entire project was put on line in July 2012.

    Hydropower

    The Nuozu Hydropower Station, on the middle reaches of the Nanpanjiang River’s main stream, has an installed capacity of 3 × 25 MW. The construction work began in December 2005; and the entire project was put on line in July 2009.

    Hydropower

    The Fenghuanggu Hydropower Station, on the lower reaches of the Nanpanjiang River, has a total installed capacity of 100 MW. The project was put on line in July 2009.

    欧美日韩亚洲中文字幕一区二区三区| 亚洲日韩精品无码专区网址| 亚洲熟妇无码另类久久久| 中文资源在线官网| 免费无码VA一区二区三区| 日韩av无码免费播放| 天堂中文在线最新版| 精品无码人妻一区二区免费蜜桃| 无码八A片人妻少妇久久| 日韩乱码人妻无码系列中文字幕 | 日韩久久无码免费毛片软件| 亚洲精品无码久久久久| 欧美中文字幕无线码视频| 久久中文字幕人妻丝袜| 国产自无码视频在线观看| 日韩午夜福利无码专区a| 亚洲中文久久精品无码ww16| 亚洲精品一级无码中文字幕 | av区无码字幕中文色| 中文无码喷潮在线播放| 97碰碰碰人妻视频无码| 国产a级理论片无码老男人| 亚洲AV无码一区二区乱子伦| 久久亚洲AV无码精品色午夜麻豆 | 四虎影视无码永久免费| 区三区激情福利综合中文字幕在线一区亚洲视频1| 亚洲av无码乱码在线观看野外 | 曰韩无码AV片免费播放不卡| 精品国产v无码大片在线观看 | 国产AV无码专区亚汌A√| 无码精品视频一区二区三区| 亚洲中文字幕无码久久2020 | 国产免费无码一区二区| 久久99精品久久久久久hb无码| 久久久久亚洲AV片无码下载蜜桃| 国精品无码一区二区三区左线| 老司机亚洲精品影院无码| 2021无码最新国产在线观看| 精品无码专区亚洲| 久久精品人妻中文系列| 日韩中文字幕视频|